Ojaskaraa Builders
Plan Your Budget

Cost Estimator

Work out material quantities and a rough project budget for your build in Nepal — instantly, before you talk to us.

Step 1

Quick Project Estimate

Get a whole-house ballpark in seconds — start here

sq.ft

Total built-up area: 700 sq.ft (700 sq.ft × 1 floor)

Mid-range materials & finishing — Current Rate: NPR 3,500 / sq.ft

Estimated Project Cost

NPR 2,450,000

* This is a rough estimate based on a flat rate per sq.ft. Actual cost depends on site location, material costs at the time, and specific design requirements.

Get a Precise Quote

Step 2

Detailed Material Calculator

Already have drawings? Work out exact quantities for one job

This calculates materials and cost for one specific slab, wall, or rebar job — not your whole house. For a whole-project ballpark, use Step 1 above.

ft
ft
ft
Cement (50kg bags)29 bags
Sand53 cu.ft
Aggregate106 cu.ft
Est. CostRs. 38,219